In Baumschulenweg, in the south-east of Berlin, the Kiefholzstraße yard is changing its sector. In its bulletin of 23 November for the next day, the Berlin Road Information Centre (VIZ) announces a traffic alternating by fire in both directions between Mörikestraße and Mosischstraße, until the end of February 2027. The Kiefholzstraße is not announced closed on this section.
The Rinkartstraße at the crossroads
The new configuration closes the outlet of the Rinkartstraße on Kiefholzstraße. To reach the Rinkartstraße, you must choose a route that does not take this crossroads. The VIZ does not publish a dedicated deviation in this bulletin and does not give precise time to switch.
The general site profile describes the previous phase, between Baumschulenstraße and Rinkartstraße, with an end posted on 25 November at 4 pm and a cut off access to the Mörikestraße. This sheet concerns another section. It does not set the end of the new construction site or the time when the Mörikestraße will return to its access: before a trip, it is better to check the last VIZ opinion and the signs in place.
The sector includes the Treptow-Kolleg. In the spring, the district announced the creation of a pedestrian crossing on the Kiefholzstraße, between Mosischstraße and Rinkartstraße, to secure the crossing of the students. This intervention is distinct from the new traffic phase announced in November.
German edition · Berlin. Archive photo: BenKs / Wikimedia Commons, CC BY-SA 3.0, creative Commons license. Boxing and dressing Libnanews, distributed under the same license; the photo does not show the works of 2026.

